The plan set
- Agency
- Washington State DOT / Washington State Ferries
- Project
- SR 20 Coupeville Ferry Terminal Agent's Office, Island County WA
- Sheet under test
- E03.04 — LIGHTING SCHEDULE
- Public source
- WSDOT contract plans (PDF)
The AI read sheet E03.04 — the published LIGHTING SCHEDULE — and returned the scheduled exterior luminaires as counted items, one line per fixture type.
AI-assisted — verify before bidVerified against the published schedule
Every line below was checked against the QTY column printed on sheet E03.04. The transcription matches exactly: 2 + 4 + 3 = 9 luminaires.
Scheduled exterior luminaires
| Item | Qty | Unit | Confidence | Source |
|---|---|---|---|---|
LED bollard light (shielded 360°) B1 — LED BOLLARD WITH SHIELDED 360° LIGHT DISTRIBUTION, 700+ LUMENS, 20.0 W | 2 | ea | 100% | Sheet E03.04 · LIGHTING SCHEDULE · row B1 (printed QTY 2) |
LED bullet head light D1 — LED BULLET HEAD LIGHT WITH HORIZONTAL AND VERTICAL ROTATION, 900+ LUMENS, 14 W | 4 | ea | 100% | Sheet E03.04 · LIGHTING SCHEDULE · row D1 (printed QTY 4) |
LED wall sconce S1 — LED WALL SCONCE LUMINAIRE, SINGLE SIDED LIGHT OUTPUT, 600+ LUMENS, 10 W | 3 | ea | 100% | Sheet E03.04 · LIGHTING SCHEDULE · row S1 (printed QTY 3) |
| Total scheduled luminaires | 9 | ea | ||
Pricing is intentionally left off this public demo — in your workspace, each line prices from your own pricebook with material, labor, and equipment splits.
Information required before bidding2
- Luminaire basis of design / approved equalsThe schedule specifies performance (lumens, wattage, distribution) but no manufacturer or part numbers. Confirm the approved manufacturers before pricing fixtures.Documents: Specification section — exterior lightingAffects: B1, D1, S1
- Mounting height for S1 wall sconcesThe schedule places the S1 sconces on the exterior front wall above the ADA ramp, but the mounting height is not dimensioned on this sheet. Confirm from the architectural elevations.Affects: S1
Where every number comes from
- Quantities were transcribed from the QTY column printed on the sheet — a published table, not a guess.
- The run is scored at zero tolerance: a transcription is either right or wrong, and this one matched the schedule exactly.
- Cross-checked against the building lighting plan (EB06.01), which tags exactly four D1 heads and three S1 sconces.