Construction change order template
Capture the change, the cost, and the new schedule on one page. Download a signed-ready PDF in seconds.
- Runs 100% in your browser
- Downloads a real PDF
- Works on mobile
Contractor
Owner / Client
Cost impact
$0.00
How to write a construction change order
A change order is the paper trail that keeps a project profitable when the scope shifts. It documents what changed, why, how much extra it costs, and how many days it adds to the schedule — signed by both sides before the work happens.
What every change order should include
- Original contract reference and change order number
- Description of the change and reason
- Cost breakdown — labor, materials, equipment, markup
- New contract total after the change
- Schedule impact in calendar days
- Signature blocks for owner and contractor