Construction punch list template

Track every open item to substantial completion. Assign it, date it, sign it off — then download the PDF for the walkthrough.

  • Runs 100% in your browser
  • Downloads a real PDF
  • Works on mobile

Project

Contractor

Punch items

How to run a construction punch list

A punch list is the final walkthrough checklist between substantial completion and final payment. Each item has a location, an assignee, a due date, and a sign-off. Keep it tight — a good punch list closes in days, not months.

What every punch list item needs

  • Location — room, area, or grid reference
  • Description of the deficiency
  • Trade or subcontractor responsible
  • Due date
  • Status — open, in progress, complete, verified
  • Sign-off by owner or GC